⚠️⚠️⚠️ CYBERIA HQ IS UNDER CONSTRUCTION ⚠️⚠️⚠️ Do you want to help with the construction effort? Get in touch with j3s or forest in matrix. We communicate about construction in the #cyberia:cyberia.club matrix channel. For more context about why construction is necessary, see the [[cyberia_hq/faq | FAQ]]. The space is to be used only for the purposes of construction currently. We have some rules if you'd like to help out: ``` Be an informed DIYer: if you do not know how to do something, find someone who does and ask them what the proper technique is. do your research - this space will be used communally, and we are responsible for making sure it is a safe environment. Do not take risks: if you feel that thing would be risky, do not do that thing. the construction site is currently hazardous, and we must respect that. Wear a respirator: buy and use an appropriate respiration device. There is a hardware store nearby that you can purchase one at - they are typically $30-$50. ``` ## What times/dates?? These are the official "work days" that are scheduled. Anyone in our community is welcome to come on these days and help out - but please make someone aware that you'll be there. Construction starts at noon on the following days: ``` [X] September 4 [X] September 11 [X] September 18 [X] September 25 [X] October 2 [x] October 9 [x] October 16 [x] October 23 [x] October 30 [x] November 6 [x] November 13 [x] November 20 [x] November 27 ``` If you are interested in helping out on days that are not listed above, get in contact with j3s. ## What do?? The list of tasks is as follows: ``` Tasks: [X] test for asbestos, mold, and radon [X] collect asbestos samples [X] mail asbestos samples [X] set up mold test [X] set up radon test [X] mail radon test [X] tell Charlie about found mold [X] minor initial cleaning [X] remove loose nails from walls [X] one sweep pass [X] drywall over the missing ceiling plaster [X] Second coat of joint compound, sand/finish [X] deconstruct awful plywood structure [X] take crappy wood off walls [X] knock down loose plaster [X] plaster over the glue on the walls [X] optional: replaster missing plaster [X] do something with the loose power cable [X] remove the upstairs sink [X] cap the pipe [X] fix remaining ceiling [X] knock out loose ceiling [X] install drywall + joint compound over ceiling [x] prime anything that looks sus [x] try out swatches [ ] address the lighting situation [ ] install ceiling LED light in front section [ ] final clean [ ] hardwood [ ] sweep [ ] mop [ ] carpet [ ] rent RugDoctor (available at the Cub Foods ~1 mi away) [ ] open furnace grate, clean chunks out of furnace carefully (be careful of asbestos) [x] figure out how to eliminate the incense smell - coat walls with glossy paint + rugdoctor [ ] pester $landlord about USI - contact fack for details [ ] drywall the bathroom - bringdaboom said he'd do this [ ] do another mold test in the bathroom post-drywall [ ] acquire storage locker (3ft wide, 7ft long, 6+ ft high) [ ] acquire storage rack (steel) (3ft wide, 7ft long, 6+ ft high) [ ] projector setup [ ] acquire projector [ ] acquire projector screen [ ] hang projector + screen [ ] acquire pulldown projector screen [ ] ventilate space appropriately [ ] acquire co2 detectors [ ] install snus's device [ ] set up first aid station [x] acquire first aid kits [ ] drop first aid kits off in space [ ] standing desks [ ] "coffee stations stuff"? [ ] sink ```